Mark Petty

  • Vanderbilt University

    Bridge over 21st Avenue South is open

    The 21st Avenue South Bridge (Neil Brake/Vanderbilt) The bridge for walkers over 21st Avenue South at Edgehill Avenue has reopened to foot traffic. Workers have been adding drainage, replacing the concrete surface and and doing other work on the bridge, said Mark Petty, assistant vice chancellor for… Read More

    Aug 9, 2011

  • Vanderbilt University

    Bridge over 21st Avenue South to close for maintenance

    The 21st Avenue South Bridge (Neil Brake/Vanderbilt) The bridge for walkers over 21st Avenue South at Edgehill Avenue will be closed most of July for maintenance. The closing begins Saturday, July 9. It is scheduled to reopen Monday, Aug. 1. Workers will add drainage, replace the concrete surface and… Read More

    Jul 5, 2011

  • Vanderbilt University

    Cicadas affect campus cooling systems

    Cicadas blocking up filters in the chillers outside of Vanderbilt and Barnard Dorms. (Steve Green/Vanderbilt) Many buildings on campus are having problems with cooling systems, and cicadas are to blame, said Mark Petty, assistant vice chancellor for plant operations. He explained that the slow-moving insects… Read More

    Jun 1, 2011

  • Vanderbilt University

    Rand Hall improvements win 2011 Energy Management Achievement award

    On April 30, (pictured from left to right) David Rehse of the Association of Energy Engineers and the Center for Energy Efficiency at MTSU presented Mark Petty, assistant vice chancellor for Plant Operations; Darren Bevill, campus energy manager; and Mitch Lampley, director of Engineering and Technical Support,… Read More

    May 2, 2011