Stevenson Center
-
Access road installation from Stevenson Center Lane to Garland Hall changes pedestrian routes beginning June 26
Garland Hall will be undergoing construction to improve the building's interior and enhance accessibility. To prepare for this project, an access road will be installed in three phases to minimize the impact to pedestrian traffic. The road is only for construction and emergency vehicles and will alter the pedestrian and bicycle routes in the area. Read MoreJun 23, 2023
-
UPDATE: Stevenson Center Lane to close July 6–8 for repaving
Stevenson Center Lane will be closed for maintenance and repaving July 6–8. This is a change in the project's original schedule. Read MoreJun 23, 2018
-
SECURITY NOTICE: Burglary on campus
On Feb. 18 at 9:30 a.m., Vanderbilt University Police Department was notified by a staff member that an office suite in the Stevenson Center had been unlawfully entered and property had been taken. Read MoreFeb 19, 2014
-
Maintenance issue at Stevenson Center Math Building cancels classes
A small fire in an air handler at the Stevenson Center’s Mathematics Building has cancelled math classes for the remainder of today, Nov. 13. Vanderbilt Plant Operations is on site to handle this issue with the building’s ventilation system. There are no injuries, but the incident has resulted in… Read MoreNov 13, 2013
-
First-year student project creates better signs for navigating Stevenson Center
Every freshman feels a little lost navigating a new campus, but for those assigned to a class in Vanderbilt’s Stevenson Center, “lost” can take on a whole new meaning. Read MoreOct 23, 2013
-
Street closure at Stevenson Center Drive May 5
To view an interactive campus map, visit www.vanderbilt.edu/map. From 6 a.m. to 6 p.m. Saturday, May 5, Stevenson Center Drive at the entrance to Lot 9 will be partially obstructed by a crane unloading equipment. From 6 to 9 a.m., the drive at Lot 9 will be completely blocked… Read MoreMay 2, 2012
-
Street closure at Stevenson Center Drive April 21
To view an interactive campus map, visit www.vanderbilt.edu/map. From 6 a.m. to 6 p.m. Saturday, April 21, Stevenson Center Drive at the entrance to Lot 9 will be partially obstructed by a crane unloading equipment. From 6 to approximately 9 a.m. the drive at Lot… Read MoreApr 17, 2012