Work continues on the pedestrian bridge over 21st Ave. South at Edgehill Ave. The bridge will not re-open Aug. 1 as originally scheduled. Traffic on 21st Ave. South is not affected by the work.
Updated information on the bridge’s status will be posted when it becomes available.