21st Avenue Bridge
-
Pedestrian bridge to close for summer months
The pedestrian bridge and walkway at 21st Avenue South and Edgehill Avenue will undergo routine maintenance this summer. Read MoreJun 6, 2018
-
Bridge over 21st Avenue South is open
The 21st Avenue South Bridge (Neil Brake/Vanderbilt) The bridge for walkers over 21st Avenue South at Edgehill Avenue has reopened to foot traffic. Workers have been adding drainage, replacing the concrete surface and and doing other work on the bridge, said Mark Petty, assistant vice chancellor for… Read MoreAug 9, 2011
-
21st Ave. bridge reopening delayed
The bridge will not re-open Aug. 1 as originally scheduled. Read MoreAug 1, 2011
-
Bridge over 21st Avenue South to close for maintenance
The 21st Avenue South Bridge (Neil Brake/Vanderbilt) The bridge for walkers over 21st Avenue South at Edgehill Avenue will be closed most of July for maintenance. The closing begins Saturday, July 9. It is scheduled to reopen Monday, Aug. 1. Workers will add drainage, replace the concrete surface and… Read MoreJul 5, 2011