Street closure at Stevenson Center Drive May 5

To view an interactive campus map, visit www.vanderbilt.edu/map.

From 6 a.m. to 6 p.m. Saturday, May 5, Stevenson Center Drive at the entrance to Lot 9 will be partially obstructed by a crane unloading equipment. From 6 to 9 a.m., the drive at Lot 9 will be completely blocked to vehicular traffic.

Traffic directors will be present throughout the day.

Contact: Mark Walker, (615) 343-6641