Street closure at Stevenson Center Drive April 21

To view an interactive campus map, visit www.vanderbilt.edu/map.

From 6 a.m. to 6 p.m. Saturday, April 21, Stevenson Center Drive at the entrance to Lot 9 will be partially obstructed by a crane unloading equipment.

From 6 to approximately 9 a.m. the drive at Lot 9 will be completely blocked to vehicular traffic. Traffic directors will be present throughout the day.

Contact: Mark Walker, (615) 343-6641