>

What you may have missed: Summer construction updates

Aerial image of campus

Even though school was out this summer, the Division of Real Estate, Facilities and Development were hard at work with campus construction projects that will reshape Vanderbilt’s campus for generations to come.  

Completed: 

Roberts Academy

The new 66,500-square-foot Roberts Academy and Dyslexia Center welcomed students this fall. The academy is at the corner of 17th Avenue South and Edgehill Avenue near Vanderbilt’s Peabody College campus, and it will also be a hub for research, teacher training and community outreach.  

Payne Hall 

Built in the early 1950s, Payne Hall has housed many of Peabody’s classrooms and faculty offices. Its last major renovation, which focused on interior updates and mechanical systems, was in 1986.  

Today’s project includes upgraded offices and classrooms, new HVAC and elevator systems, a new roof and windows, restored historical masonry and improved accessibility throughout the building. The building will be open for community members this fall. 

Under Construction: 

Peabody Residential College

The expansion of The Martha Rivers Ingram Commons on the Peabody campus is scheduled to open at the beginning of the 2027–28 academic year.   

The new house will welcome approximately 187 first-year students and, like the existing Commons houses, will feature an apartment for the head of house and collaboration spaces on each floor for academic and social engagement. Construction began in December 2025 and continued throughout the summer. 

Central Utilities Initiative 

The Central Utilities Initiative is Vanderbilt’s ongoing effort to upgrade campus utilities for current and future needs.  

Though much of the seemingly unglamorous work is underground, it is essential to the success of future projects, including the Central Neighborhood Residential Colleges and the former Stevenson Center 6. In support of the FutureVU initiative, the CUI upgrades chilled and hot water lines and moves overhead utilities underground to improve campus resiliency. 

Central Neighborhood 

Extending the beauty of the West End Neighborhood across Vanderbilt Place, the university is developing its next phase of residential colleges in the Central Neighborhood.   

Once complete, the area will feature three new residential colleges, a café and collaborative green space. The colleges will open in phases, beginning with the 2028–29 academic year. 

Former Stevenson Center 6  

Site preparation is complete and foundation work is underway at former Stevenson Center 6 for a new state-of-the-art science building. The collaborative space will be shared by the College of Arts and Science, the School of Engineering and the School of Medicine Basic Sciences.  

This initiative supports Vanderbilt’s broader goal of creating physical spaces that foster scientific research and discovery. The new science building is expected to open for the 2028–29 academic year. 

Hawkins Field 

Home of the VandyBoys, Hawkins Field is getting a brand-new right field structure that will house private suites, premium seating, two bars and a player pitching lab for the stadium, which opened in 2002.   

When the project is completed, the Hawkins Field footprint will encompass approximately 50,000 square feet of new or enhanced space, including student-athlete resources, more room for Commodore Nation, premium seating and expanded food and beverage options. 

The project recently celebrated a milestone with a topping-out ceremony. Read more about the ceremony and the rest of the project online.  

Construction will continue throughout the offseason, and the project is expected to be completed during the 2027 season. 

What You Need to Know for This School Year

To stay up to date on the latest construction updates and how they affect you, sign up for our bi-weekly construction newsletter, Anchor Updates. 

You can also sign up for our new AnchorAlerts system, a centralized, modern approach to communicating construction activity that will help Vanderbilt manage information about its extensive capital projects. 

Users can submit feedback in real time by texting “ConstructVU” to 55744, which connects directly with Vanderbilt’s Planning, Design and Construction team.